Heavy Equipment Shipping from China

Excavators, loaders, CNC machines and production lines by flat rack, open top, RoRo or break bulk, with dismantling, cleaning and lashing planned first.

Flat Rack and Open Top

Machine dimensions checked against carrier specs before booking.

Dismantling Planned First

Buckets, booms or cabs removed to fit the cheapest option.

Used Machinery Cleaning

Soil and plant residue removed and documented before export.

Lashing and Survey Records

Secured to carrier standards, with photos and survey reports kept.

Quick Answer: How to Ship Heavy Equipment from China

Heavy equipment from China ships by flat rack, open top, RoRo or break bulk, depending on the machine's dimensions, weight and whether it can be driven. A 40ft flat rack carries about 40 tonnes on a floor about 12 m long and 2.2 m wide, while a 40ft open top takes about 26.7 tonnes within a 2.34 m width.

Removing a bucket, boom or cab often brings a machine into a cheaper container. Used machinery must be cleaned of soil and plant residue before export, and loads wider than 2.55 m or higher than 4 m on the truck need a road permit in China.

Heavy Equipment from China: Check Fit, Cost & Quote Details

The cheapest option is usually the smallest one the machine fits after dismantling. Use the four cards to see when a specialist plan applies, what it costs, what changes the quote and what to send.

🏗️ When Heavy Equipment Needs a Specialist Plan

Bulk cargo • Lower cost for large shipments
  • Machines: Construction machinery, CNC machines, production lines and used equipment.
  • Checks: Dimensions after dismantling, securing plan and cleaning records.
  • Timing: Plan the method before production or sale is finished.
  • Choose this if: The machine is wider than 2.34 m or heavier than a standard box allows.

💵 What Heavy Equipment Shipping Costs

FCL rates • LCL per CBM • 2026 guide
  • Freight: Per container, per revenue ton or per unit.
  • Port side: Crane and heavy-lift fees, lashing materials and surveys.
  • Inland: Low-bed trucking, road permits, cleaning and any lost-slot charges.
  • Choose this if: You want every lifting and permit line priced upfront.

📋 What Changes Your Quote

CBM • Container type • Route-based pricing
  • Size: Overall dimensions after dismantling and weight per piece.
  • Handling: Centre of gravity and whether the machine can be driven.
  • Route: The inland road to the port and the sailing schedule.
  • Choose this if: Small dismantling changes could switch the equipment type.

✅ How to Get an Accurate Quote

Better quote • Fewer price changes
  • Send these details: Make and model, length, width, height and weight after dismantling.
  • Add: Drawings with lifting points, photos, and whether it is new or used.
  • Route: Pickup address and destination port or site.
  • Choose this if: You want the method confirmed before the machine is packed.

Send your machine's dimensions and photos and we will confirm the method, permits and loading plan.

Get My Heavy Equipment Quote

Most heavy equipment questions come down to three things: what type of machine it is, which equipment it fits, and how it is prepared and loaded.

This page answers them in that order. For vessel types such as break bulk and RoRo, see our break bulk shipping guide.

A machine dismantled correctly usually ships cheaper.

Your Questions
Answered